shrimbly
2bd826289b
docs(19-02): complete type extraction plan
Phase 19 complete. All types now organized into 7 domain files:
annotation, nodes, providers, models, workflow, api, quickstart.
index.ts is a pure re-export hub.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
6 months ago
shrimbly
b69398c3a9
docs(19-01): complete type extraction plan
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
6 months ago
shrimbly
7e6c39a7d5
docs(19): create phase plan
Phase 19: Type Refactoring
- 2 plans created
- 6 tasks total defined
- Ready for execution
6 months ago
shrimbly
4c83d72245
docs(22-01): complete generate node dynamic input tests plan
Tasks completed: 4/4 (1 pre-existing)
- ModelParameters tests (already existed)
- GenerateImageNode dynamic handle tests (+10 tests)
- GenerateVideoNode dynamic handle tests (+7 tests)
- API route parameters tests (+4 tests)
SUMMARY: .planning/phases/22-generate-node-dynamic-input-tests/22-01-SUMMARY.md
6 months ago
shrimbly
0161a823dc
docs(21): create phase plan
Phase 21: Fix Image Input & Deduplication Issues
- 1 plan created
- 2 tasks + 1 checkpoint defined
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
6 months ago
shrimbly
943d0f5099
docs(22): create phase plan
Phase 22: Generate Node Dynamic Input Tests
- 1 plan created (22-01-PLAN.md)
- 3 tasks defined: ModelParameters tests, GenerateImageNode/GenerateVideoNode dynamic handle tests
- Ready for execution
6 months ago
shrimbly
dfd3d2e4d8
docs(18-05): complete models route tests plan
Tasks completed: 2/2 (combined)
- Create models route tests for basic functionality
- Add models route tests for caching and error handling
SUMMARY: .planning/phases/18-api-route-tests/18-05-SUMMARY.md
6 months ago
shrimbly
ebe0158a09
docs(18-04): complete generate route Replicate/fal.ai tests plan
Tasks completed: 2/2
- Add generate route tests for Replicate provider
- Add generate route tests for fal.ai provider
SUMMARY: .planning/phases/18-api-route-tests/18-04-SUMMARY.md
6 months ago
shrimbly
f4cc2e021a
docs(18-03): complete generate route Gemini tests plan
Tasks completed: 2/2
- Gemini provider tests (20 tests)
- Validation and edge case tests (11 tests)
SUMMARY: .planning/phases/18-api-route-tests/18-03-SUMMARY.md
6 months ago
shrimbly
7494a0c551
docs(18-02): complete LLM route tests plan
Tasks completed: 2/2
- Google provider tests (9 tests)
- OpenAI provider tests (9 tests)
SUMMARY: .planning/phases/18-api-route-tests/18-02-SUMMARY.md
6 months ago
shrimbly
9b691894ba
docs(18-01): complete file I/O routes tests plan
Tasks completed: 2/2
- Workflow route tests (14 tests)
- Save-generation route tests (15 tests)
SUMMARY: .planning/phases/18-api-route-tests/18-01-SUMMARY.md
6 months ago
shrimbly
ecd73e61bb
docs(18): create API route tests plan
Phase 18: API Route Tests
- 5 plans created covering:
- 18-01: File I/O routes (workflow, save-generation)
- 18-02: LLM route (Google, OpenAI providers)
- 18-03: Generate route (Gemini provider)
- 18-04: Generate route (Replicate, fal.ai providers)
- 18-05: Models route (caching, aggregation)
- 10 total tasks defined
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
6 months ago
shrimbly
5931648b7c
docs(17-11): complete utility component tests plan - PHASE 17 COMPLETE
Tasks completed: 2/2
- Add GlobalImageHistory component tests (30 tests)
- Add GroupsOverlay and ModelParameters tests (54 tests)
Phase 17 Summary:
- 11 plans executed
- ~560 new component tests added
- Total: 997 tests passing
SUMMARY: .planning/phases/17-component-tests/17-11-SUMMARY.md
6 months ago
shrimbly
00f149ab06
docs(17-10): complete quickstart component tests plan
Tasks completed: 2/2
- Add WelcomeModal and QuickstartInitialView tests (29 tests)
- Add remaining quickstart component tests (54 tests)
SUMMARY: .planning/phases/17-component-tests/17-10-SUMMARY.md
6 months ago
shrimbly
863221a95f
docs(17-09): complete editor modals component tests plan
Tasks completed: 2/2
- Add PromptEditorModal component tests (30 tests)
- Add SplitGridSettingsModal and AnnotationModal tests (69 tests)
SUMMARY: .planning/phases/17-component-tests/17-09-SUMMARY.md
6 months ago
shrimbly
e41b045632
docs(17-08): complete core modals component tests plan
Tasks completed: 2/2
- Add ModelSearchDialog component tests (31 tests)
- Add ProjectSetupModal and CostDialog tests (57 tests)
SUMMARY: .planning/phases/17-component-tests/17-08-SUMMARY.md
6 months ago
shrimbly
34cfbee7fe
docs(17-07): complete menus and notifications component tests plan
Tasks completed: 2/2
- Add ConnectionDropMenu component tests (22 tests)
- Add Toast and CostIndicator tests (47 tests)
SUMMARY: .planning/phases/17-component-tests/17-07-SUMMARY.md
6 months ago
shrimbly
068c2811e7
docs(17-06): complete canvas and edge component tests plan
Tasks completed: 2/2
- Add WorkflowCanvas component tests (31 tests)
- Add edge component tests (43 tests)
SUMMARY: .planning/phases/17-component-tests/17-06-SUMMARY.md
6 months ago
shrimbly
ea898cb663
docs(17-05): complete toolbar component tests plan
Tasks completed: 2/2
- Add Header component tests (31 tests)
- Add FloatingActionBar and MultiSelectToolbar tests (58 tests)
SUMMARY: .planning/phases/17-component-tests/17-05-SUMMARY.md
6 months ago
shrimbly
9b38380f27
docs(17-04): complete processing nodes component tests plan
Tasks completed: 2/2
- Add LLMGenerateNode component tests (25 tests)
- Add AnnotationNode component tests (24 tests)
SUMMARY: .planning/phases/17-component-tests/17-04-SUMMARY.md
6 months ago
shrimbly
fb6dddd462
docs(17-03): complete generate nodes component tests plan
Tasks completed: 2/2
- Add GenerateImageNode component tests (36 tests)
- Add GenerateVideoNode component tests (38 tests)
SUMMARY: .planning/phases/17-component-tests/17-03-SUMMARY.md
6 months ago
shrimbly
2938c6584d
docs(17-02): complete display nodes component tests plan
Tasks completed: 2/2
- Add OutputNode component tests (31 tests)
- Add SplitGridNode and GroupNode tests (51 tests)
SUMMARY: .planning/phases/17-component-tests/17-02-SUMMARY.md
6 months ago
shrimbly
9e4f2f8dc6
docs(17-01): complete core nodes component tests plan
Tasks completed: 2/2
- Add BaseNode component tests (35 tests)
- Extend PromptNode tests and add ImageInputNode tests (24 tests)
SUMMARY: .planning/phases/17-component-tests/17-01-SUMMARY.md
6 months ago
shrimbly
92355faec1
docs(17): update state for phase 17 planning complete
- 11 plans created for component tests
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
6 months ago
shrimbly
b9cf6042f4
docs(16-01): complete extract localStorage and node defaults plan
Tasks completed: 3/3
- Create store utilities module (localStorage.ts)
- Create node defaults module (nodeDefaults.ts)
- Add unit tests for extracted modules
SUMMARY: .planning/phases/16-store-modularization/16-01-SUMMARY.md
Reduced workflowStore.ts by 239 lines (2786 → 2547)
Added 35 new tests (total: 147)
6 months ago
shrimbly
9e636402cf
remove docs from tracking
6 months ago
shrimbly
be2387e1e8
docs(14-01): complete fix drag-connect node creation bugs plan
Phase 14 complete - Milestone v1.1 finished
Tasks completed:
- Normalize dynamic handle IDs to standard values
- Update connection validation for normalized handles
- Map normalized handles to schema names in execution
- Add placeholder handles for unused input types
SUMMARY: .planning/phases/14-fix-drag-connect-bugs/14-01-SUMMARY.md
Co-Authored-By: Claude <noreply@anthropic.com>
6 months ago
shrimbly
878e7f5a08
docs(13-01): complete content deduplication plan
Tasks completed: 2/2
- Add content hashing to save-generation API
- Add duplicate detection response handling
SUMMARY: .planning/phases/13-fix-duplicate-generations/13-01-SUMMARY.md
6 months ago
shrimbly
68f1dbdcc3
fix(12-01): resolve parameter passing and image input detection
- Fix isImageInput() to use word-boundary checks instead of substring
matching, preventing num_images from being misclassified as image input
- Fix stale node data in workflow execution by getting fresh data from
store instead of using captured array references
- Add missing parameters to regenerateNode request bodies for both
nanoBanana and generateVideo nodes
- Update fal.ai schema fetch to use Model Search API endpoint
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
6 months ago
shrimbly
58eddbc897
docs(11-01): complete UI Polish phase
- Create 11-01-SUMMARY.md with phase completion details
- Update STATE.md: Phase 11 complete, 20 plans total
- Update ROADMAP.md: Mark Phase 11 complete
- Add decisions: provider badges, titlePrefix prop, header alignment
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
6 months ago
shrimbly
c0425faa5c
docs(11): create UI polish phase plan
Phase 11: UI Polish
- 1 plan created
- 3 tasks defined (2 auto + 1 verification)
- Resolved UAT-001 (provider icons now use real logos)
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
6 months ago
shrimbly
451de74834
docs(10-01): complete node autosizing plan
Tasks completed: 2/2
- Create node dimension calculation utility
- Auto-resize generate nodes on output
SUMMARY: .planning/phases/10-node-autosizing/10-01-SUMMARY.md
6 months ago
shrimbly
712da6ccf6
docs(09-01): complete video history plan
- Create 09-01-SUMMARY.md with implementation details
- Update STATE.md with current position and metrics
- Update ROADMAP.md to mark Phase 9 complete
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
6 months ago
shrimbly
62ae30ab55
docs(08-01): complete error display plan
Tasks completed: 4/4
- Update Toast component for error notifications
- Add error overlay to GenerateImageNode
- Add error overlay to GenerateVideoNode
- UAT verification with visual refinements
SUMMARY: .planning/phases/08-error-display/08-01-SUMMARY.md
6 months ago
shrimbly
e0075a98f7
docs: create milestone v1.1 Improvements (6 phases)
Phases:
- 7. video-connections: Fix video handle connections to valid targets
- 8. error-display: Better error visibility with overlay display
- 9. video-history: Add history carousel for generated videos
- 10. node-autosizing: Auto-size nodes to output dimensions
- 11. ui-polish: Flora UI, header, settings, provider logos
- 12. model-improvements: Verify Replicate models, extend cache TTL
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
6 months ago
shrimbly
b2c4958c51
docs(06-03): complete custom model parameters plan
Tasks completed: 3/3
- Add schema endpoint and model schema fetching
- Add parameter UI component
- Pass parameters through generation pipeline
SUMMARY: .planning/phases/06-video-and-polish/06-03-SUMMARY.md
Resolved: ISS-001 - Generate nodes now adapt to model requirements
6 months ago
shrimbly
56bcaed48a
docs(06-02): complete video playback plan
Tasks completed: 3/3
- Update OutputNode for video detection and playback
- Connect generateVideo output to workflow pipeline
- Bug fix: create generateVideo node for video models in browser
SUMMARY: .planning/phases/06-video-and-polish/06-02-SUMMARY.md
6 months ago
shrimbly
ee8ade26a7
docs(06-01): complete GenerateVideo node plan
Tasks completed: 2/2
- Create GenerateVideoNode component
- Add video generation to API route
SUMMARY: .planning/phases/06-video-and-polish/06-01-SUMMARY.md
6 months ago
shrimbly
32581ced85
docs(05-02): complete provider image integration plan
Tasks completed: 3/3
- Update generateWithReplicate to pass image input
- Update generateWithFal to pass image_url parameter
- Upload images to URL server with cleanup
Phase 5 complete. Ready for Phase 6: Video & Polish.
SUMMARY: .planning/phases/05-image-url-server/05-02-SUMMARY.md
6 months ago
shrimbly
e9c735b1f7
docs(05-01): complete image serving endpoint plan
Tasks completed: 3/3
- In-memory image store with explicit cleanup
- Image serving API endpoint
- uploadImageForUrl utility
SUMMARY: .planning/phases/05-image-url-server/05-01-SUMMARY.md
6 months ago
shrimbly
8f612229ed
docs(04-02): complete model search dialog plan
Tasks completed: 2/2 (+ UAT refinements)
- Create ModelSearchDialog component
- Add model selection behavior
UAT refinements:
- Improved model cards with capability badges
- Widened dialog, added external links
- Variant suffix for fal.ai models
SUMMARY: .planning/phases/04-model-search-dialog/04-02-SUMMARY.md
6 months ago
shrimbly
3b1745f5fc
docs(04-01): complete floating action bar provider icons plan
Tasks completed: 2/2
- Add provider icon buttons to FloatingActionBar
- Add dialog state management and placeholder
SUMMARY: .planning/phases/04-model-search-dialog/04-01-SUMMARY.md
6 months ago
shrimbly
c2180878f8
docs(03-03): complete backward compatibility plan
Tasks completed: 3/3
- Add workflow migration logic for legacy nodes
- Update executeWorkflow for multi-provider dispatch
- Handle legacy data in GenerateImageNode UI
SUMMARY: .planning/phases/03-generate-node-refactor/03-03-SUMMARY.md
6 months ago
shrimbly
86755d087c
docs(03-02): complete provider-specific execution plan
Tasks completed: 3/3
- Implement Replicate provider generate() method
- Implement fal.ai provider generate() method
- Update generate API route for multi-provider dispatch
SUMMARY: .planning/phases/03-generate-node-refactor/03-02-SUMMARY.md
6 months ago
shrimbly
11e212a1a1
docs(03-01): complete rename NanoBanana to GenerateImage plan
Tasks completed: 3/3
- Add SelectedModel type and update NanoBananaNodeData
- Create GenerateImageNode with provider/model selector
- Update store and canvas references
SUMMARY: .planning/phases/03-generate-node-refactor/03-01-SUMMARY.md
6 months ago
shrimbly
a6d520620f
docs(02-03): complete model caching plan
Phase 2: Model Discovery is now complete with all 3 plans executed:
- 02-01: Replicate provider
- 02-02: fal.ai provider
- 02-03: Model caching and unified API
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
6 months ago
shrimbly
c7b37fcb89
docs(02-02): complete fal.ai provider plan
Tasks completed: 2/2
- Create fal.ai provider implementation
- Create fal.ai models API route
SUMMARY: .planning/phases/02-model-discovery/02-02-SUMMARY.md
6 months ago
shrimbly
e56decf5d5
docs(02-01): complete Replicate provider plan
Tasks completed: 2/2
- Create Replicate provider implementation
- Create Replicate models API route
SUMMARY: .planning/phases/02-model-discovery/02-01-SUMMARY.md
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
6 months ago
shrimbly
ef662306e0
docs(01): complete Phase 1 Provider Infrastructure
Phase 1 Summary:
- Plan 01-01: Provider settings UI in ProjectSetupModal (12 min)
- Plan 01-02: Provider abstraction layer and types (2 min)
Provides:
- ProviderConfig types for API key management
- Provider settings UI with enable/disable toggles
- ProviderInterface contract for provider implementations
- Provider registry with self-registration pattern
Ready for Phase 2: Model Discovery
6 months ago
shrimbly
3967400131
docs(01-01): complete provider settings UI plan
- Create 01-01-SUMMARY.md with execution details
- Update STATE.md with new position and metrics
- Mark 01-01 complete in ROADMAP.md
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
6 months ago