11 KiB
Roadmap: Node Banana Multi-Provider Support
Overview
Transform Node Banana from a Gemini-only image generator into a multi-provider platform supporting Replicate and fal.ai. The journey builds provider infrastructure first, then adds dynamic model discovery, refactors the generate node for flexibility, creates a searchable model browser, adds local image serving for URL-based providers, and finishes with video support and polish.
Domain Expertise
None
Milestones
- ✅ v1.0 Multi-Provider Support - Phases 1-6 (shipped 2026-01-11)
- ✅ v1.1 Improvements - Phases 7-14 (shipped 2026-01-12)
- 🚧 v1.2 Improvements - Phases 15-20 (in progress)
Phases
Phase Numbering:
- Integer phases (1, 2, 3): Planned milestone work
- Decimal phases (2.1, 2.2): Urgent insertions (marked with INSERTED)
✅ v1.0 Multi-Provider Support (Phases 1-6) - SHIPPED 2026-01-11
Phase 1: Provider Infrastructure
Goal: Users can configure Replicate and fal.ai API keys in settings, with keys securely stored Depends on: Nothing (first phase) Research: Unlikely (internal UI patterns, Zustand state management) Plans: 2 plans
Plans:
- 01-01: Provider settings UI in ProjectSetupModal
- 01-02: Provider abstraction layer and types
Phase 2: Model Discovery
Goal: App can fetch and cache available models from enabled providers at runtime Depends on: Phase 1 Research: Likely (external APIs) Research topics: Replicate model listing API endpoints, fal.ai model discovery endpoints, response schemas and pagination Plans: 3 plans
Plans:
- 02-01: Replicate model fetching API route
- 02-02: fal.ai model fetching API route
- 02-03: Model caching and unified model interface
Phase 3: Generate Node Refactor
Goal: NanoBanana node becomes GenerateImage node supporting any provider's image models Depends on: Phase 2 Research: Unlikely (internal refactoring using existing patterns) Design decision: Separate nodes for image vs video generation (GenerateVideo added in Phase 6) Plans: 3 plans
Plans:
- 03-01: Rename NanoBanana to GenerateImage, add model selector (image models only)
- 03-02: Provider-specific execution in generate API route
- 03-03: Backward compatibility for existing workflows
Phase 4: Model Search Dialog
Goal: Users can browse models via floating action bar icons and searchable dialog Depends on: Phase 3 Research: Unlikely (internal UI using React patterns) Plans: 2 plans
Plans:
- 04-01: Floating action bar with provider icons
- 04-02: Model search dialog with filtering and selection
Phase 5: Image URL Server
Goal: Local API endpoint serves workflow images as URLs for providers requiring URL inputs Depends on: Phase 3 Research: Unlikely (Next.js API routes, existing patterns) Plans: 2 plans
Plans:
- 05-01: Image serving endpoint and URL generation
- 05-02: Integration with generate node for URL-based providers
Phase 6: Video & Polish
Goal: GenerateVideo node for video generation, video playback, custom parameters, edge cases Depends on: Phase 5 Research: Likely (video handling) Research topics: HTML5 video element for base64/blob URLs, provider response formats for video content Design decision: GenerateVideo as separate node type (not combined with GenerateImage) Plans: 4 plans
Plans:
- 06-01: GenerateVideo node with video-capable model selector
- 06-02: Video playback in output node
- 06-03: Custom model parameters from provider schemas
- 06-04: Edge case handling and final polish
✅ v1.1 Improvements (Phases 7-14) - SHIPPED 2026-01-12
Milestone Goal: Fix connection issues, improve error visibility, add video history, auto-size nodes, and polish UI
Phase 7: Video Connections ✅
Goal: Fix video handle connections to only allow valid targets (generateVideo, output) Depends on: Phase 6 Research: Unlikely (internal connection validation patterns) Plans: 1 plan
Plans:
- 07-01: Add video handle type and connection validation
Phase 8: Error Display ✅
Goal: Better error visibility with overlay display, not hidden by previous output Depends on: Phase 7 Research: Unlikely (internal UI patterns) Plans: 1 plan
Plans:
- 08-01: Error notifications with persistent toast and node overlays
Phase 9: Video History ✅
Goal: Add history carousel for generated videos matching image history pattern Depends on: Phase 8 Research: Unlikely (existing image history pattern) Plans: 1 plan
Plans:
- 09-01: Video history types, store support, load API, and carousel UI
Phase 10: Node Autosizing ✅
Goal: Auto-size nodes to output dimensions and aspect ratio Depends on: Phase 9 Research: Unlikely (React Flow node sizing) Plans: 1 plan
Plans:
- 10-01: Node dimension utility and auto-resize on output
Phase 11: UI Polish ✅
Goal: Flora UI alignment, header UI improvements, project settings, provider logos on nodes Depends on: Phase 10 Research: Unlikely (internal UI work) Plans: 1 plan
Plans:
- 11-01: Provider badges on nodes and header UI streamlining
Phase 12: Model Improvements ✅
Goal: Verify Replicate image models work, extend model cache TTL Depends on: Phase 11 Research: Likely (Replicate API behavior verification) Research topics: Replicate image model endpoints, cache invalidation strategies Plans: 1 plan
Plans:
- 12-01: Extended cache TTL, fixed isImageInput, fixed stale node data in execution
Phase 13: Fix Duplicate Generations ✅
Goal: Fix image deduplication - generations folder has duplicate images due to hashing failure Depends on: Phase 12 Research: Likely (investigate current hashing implementation) Research topics: Current save-generation hashing logic, why duplicates are being created Plans: 1 plan
Plans:
- 13-01: Add MD5 content hashing and deduplication to save-generation API
Phase 14: Fix Drag-Connect Node Creation Bugs ✅
Goal: Fix bugs with nodes created via drag-connect: (1) connection vanishes after selecting model from browser, (2) defaults to Gemini with missing model selector in header Depends on: Phase 13 Research: Unlikely (React Flow connection state, node creation flow) Research topics: Connection state during node creation, model selection callbacks, createDefaultNodeData initialization Plans: 1 plan
Plans:
- 14-01: Normalize dynamic handle IDs and fix connection persistence
🚧 v1.2 Improvements (In Progress)
Milestone Goal: Add automated testing across the application and modularize large monolithic files for better maintainability
Phase 15: Test Infrastructure
Goal: Set up testing framework with Vitest and React Testing Library for Next.js 16 Depends on: Phase 14 Research: Likely (Vitest + Next.js 16 App Router setup) Research topics: Vitest configuration for Next.js 16, React Testing Library setup, test file organization Plans: TBD
Plans:
- 15-01: React Testing Library setup and configuration
Phase 16: Store Modularization ✅
Goal: Break up workflowStore.ts into focused modules (execution, nodes, edges, persistence) Depends on: Phase 15 Research: Unlikely (internal Zustand patterns) Plans: 1 plan
Plans:
- 16-01: Extract localStorage helpers and node defaults to utility modules
Phase 17: Component Tests
Goal: Add tests for all 34 React components covering nodes, toolbars, modals, and edges Depends on: Phase 16 Research: Unlikely (established React Testing Library patterns) Plans: 11 plans
Plans:
- 17-01: Core Nodes (BaseNode, PromptNode, ImageInputNode)
- 17-02: Display Nodes (OutputNode, SplitGridNode, GroupNode)
- 17-03: Generate Nodes (GenerateImageNode, GenerateVideoNode)
- 17-04: Processing Nodes (LLMGenerateNode, AnnotationNode)
- 17-05: Toolbars (Header, FloatingActionBar, MultiSelectToolbar)
- 17-06: Canvas & Edges (WorkflowCanvas, EditableEdge, ReferenceEdge, EdgeToolbar)
- 17-07: Menus & Notifications (ConnectionDropMenu, Toast, CostIndicator)
- 17-08: Core Modals (ModelSearchDialog, ProjectSetupModal, CostDialog)
- 17-09: Editor Modals (PromptEditorModal, SplitGridSettingsModal, AnnotationModal)
- 17-10: Quickstart (WelcomeModal, QuickstartInitialView, QuickstartTemplatesView, PromptWorkflowView, QuickstartBackButton)
- 17-11: Utilities (GlobalImageHistory, GroupsOverlay, ModelParameters)
Phase 18: API Route Tests
Goal: Add tests for generate, llm, and workflow API routes Depends on: Phase 17 Research: Unlikely (Next.js API route testing patterns) Plans: TBD
Plans:
- 18-01: TBD (run /gsd:plan-phase 18 to break down)
Phase 19: Type Refactoring
Goal: Split types/index.ts into domain-specific type files (nodes, providers, workflow) Depends on: Phase 18 Research: Unlikely (internal refactoring) Plans: TBD
Plans:
- 19-01: TBD (run /gsd:plan-phase 19 to break down)
Phase 20: Integration Tests
Goal: End-to-end workflow execution tests covering node connections and data flow Depends on: Phase 19 Research: Unlikely (internal testing patterns) Plans: TBD
Plans:
- 20-01: TBD (run /gsd:plan-phase 20 to break down)
Progress
Execution Order: Phases execute in numeric order: 1 → 2 → ... → 14 → 15 → 16 → 17 → 18 → 19 → 20
| Phase | Milestone | Plans Complete | Status | Completed |
|---|---|---|---|---|
| 1. Provider Infrastructure | v1.0 | 2/2 | Complete | 2026-01-09 |
| 2. Model Discovery | v1.0 | 3/3 | Complete | 2026-01-09 |
| 3. Generate Node Refactor | v1.0 | 3/3 | Complete | 2026-01-09 |
| 4. Model Search Dialog | v1.0 | 2/2 | Complete | 2026-01-09 |
| 5. Image URL Server | v1.0 | 2/2 | Complete | 2026-01-09 |
| 6. Video & Polish | v1.0 | 4/4 | Complete | 2026-01-11 |
| 7. Video Connections | v1.1 | 1/1 | Complete | 2026-01-12 |
| 8. Error Display | v1.1 | 1/1 | Complete | 2026-01-12 |
| 9. Video History | v1.1 | 1/1 | Complete | 2026-01-12 |
| 10. Node Autosizing | v1.1 | 1/1 | Complete | 2026-01-12 |
| 11. UI Polish | v1.1 | 1/1 | Complete | 2026-01-12 |
| 12. Model Improvements | v1.1 | 1/1 | Complete | 2026-01-12 |
| 13. Fix Duplicate Generations | v1.1 | 1/1 | Complete | 2026-01-12 |
| 14. Fix Drag-Connect Node Creation Bugs | v1.1 | 1/1 | Complete | 2026-01-12 |
| 15. Test Infrastructure | v1.2 | 1/1 | Complete | 2026-01-12 |
| 16. Store Modularization | v1.2 | 1/1 | Complete | 2026-01-12 |
| 17. Component Tests | v1.2 | 4/11 | In progress | - |
| 18. API Route Tests | v1.2 | 0/? | Not started | - |
| 19. Type Refactoring | v1.2 | 0/? | Not started | - |
| 20. Integration Tests | v1.2 | 0/? | Not started | - |