You can not select more than 25 topics Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
 
 

2.2 KiB

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-01-09)

Core value: Provider infrastructure that dynamically discovers models from external APIs, enabling users to access hundreds of image/video generation models without hardcoding schemas. Current focus: Phase 3 - Generate Node Refactor

Current Position

Phase: 3 of 6 (Generate Node Refactor) Plan: 0 of 3 in current phase Status: Ready to start Phase 3 Last activity: 2026-01-09 - Completed 02-03-PLAN.md (Model caching)

Progress: [=================================] 33% (5/15 plans)

Performance Metrics

Velocity:

  • Total plans completed: 5
  • Average duration: 6 min
  • Total execution time: 0.5 hours

By Phase:

Phase Plans Total Avg/Plan
1. Provider Infrastructure 2/2 14 min 7 min
2. Model Discovery 3/3 14 min 4.7 min

Recent Trend:

  • Last 5 plans: 2 min, 4 min, 5 min, 5 min
  • Trend: stable

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • Gemini always enabled via env var (GEMINI_API_KEY), Replicate/fal.ai optional
  • API keys stored in localStorage under node-banana-provider-settings key
  • Local state in modal to avoid saving on every keystroke
  • Provider config pattern: {id, name, enabled, apiKey, apiKeyEnvVar?}
  • Provider registry uses self-registration pattern via registerProvider()
  • Gemini remains special-cased in /api/generate for now, not yet migrated
  • Capability inference from model name/description keywords
  • fal.ai API key optional (works without but rate limited)
  • fal.ai auth header: "Key {apiKey}" format (not Bearer)
  • fal.ai category maps directly to ModelCapability (no inference)
  • 10-minute cache TTL for model lists
  • Unified API at /api/models with header-based auth

Deferred Issues

None.

Blockers/Concerns

  • Pre-existing lint configuration issue (ESLint not configured). Not blocking development.

Session Continuity

Last session: 2026-01-09 Stopped at: Completed Phase 2 (02-03-PLAN.md) Resume file: None Next action: Plan Phase 3 (03-01-PLAN.md - Rename NanoBanana to Generate)